a few low quality pics of inside the 2nd floor - more or less finished
now, just a bit of trim to be painted and little odds'n'ends here and there to do.


living room, complete with new "couch." another expensive one.








back bedroom/office/junk room. somehow one of the new windows is cracked, but that's not getting replaced for a while.







the office part... if i ever get to work from home again.








and the kitchen. ikea cabinets and countertops. planned so that the countertops did not need to be cut (they come in 3 standard lengths; we got a long a nd a medium), so hopefully they will keep their structural integrity longer/be less susceptible to moisture penetration. cabinets need doorknobs on them and eventually we'll need to put in a backsplash, otherwise it's finished.

Monday, August 31, 2009

grayvic

i thought i'd already posted some grayvicpics, but i guess not.


thar she glows, all gray and white and orange. the painter says the sidewalk traffic is 70/30 in favor of the orange ceilings.







porch halfway through being rebuilt: still has to have a couple more columns and handrails added in, new steps built and and missing trim up top filled in. then the painter will come back and finish it off. oh, and i need to coat the deck with sikkens (already coated the underside and tongues/grooves before installation).

Sunday, June 28, 2009

painted love

work has started on painting the house. my chants of, "oh, i can paint that" when we bought the house are on the endangered speaker's list.












the siding on the back was in the worst shape: it gets uninterrupted afternoon sun while the rest of the house gets some respite from other buildings and surrounding trees. so, it made more sense to have it re-sided.












we're going to have the front porch rebuilt in the next few weeks too, so that will be the last part to be repainted when it's put back together.







pictures show most of the scraping and sanding completed.














house will be lightly pressure washed this coming week before they apply oil-based primer. oil-based paints will essentially be outlawed by the end of the year in vermont, we are told.

Sunday, June 07, 2009

kitchen in place

got the kitchen base cabinets in place. not anchored down yet - need to decide whether to align with floor, wall or ceiling...


floor actually seems reasonably level, so it shouldn't be too troublesome. we went with exposed legs on this kitchen instead of the covered plinth style. these seem more sturdy and less potential to look crappy like the plinth does if the floor isn't level.





haven't picked up the countertops yet, but will probably use ikea numerar. also need to get a filler piece for the right angle cabinets before it all gets nailed down.

Thursday, May 14, 2009

garden state

the 2009 garden is in play. one weekend's work on april 19 did it.


lovely, beautiful, fine compost from our twin bin. couldn't have asked for better. nice and processed, dry and crumbly, super loamy.







had the old window frames lying around, so thought this might help get some heat into the ground and the seeds started, since we've definitely had seeds rot in dampness in past years. worked a treat on the potatoes, and most of the other seedlings are poking through too now.




turned this little corner into our herb/strawberry/sunflower garden. the local cats have other ideas though, so our hopes are modest.

Sunday, March 29, 2009

happy ending

the floor refinishing on the second floor was done quickly and looks great.

kitchen with original pine floor refinished.











floor was sanded, stained, stained again, polyurethaned, lightly sanded, polyurethaned, lightly sanded, and polyurethaned one final time.










patch in floor from old plumbing mess. looks pretty good, but will be covered by kitchen cabinets anyway.







refrigerator closet - reused some old wood from the hall floor to fill in this area, where previously there was none.







hallway with new bruce prefinished oak flooring. the quality is good, but it looks a little new, especially with the slight beveled edges of each of the planks. it should look better when the carpets and thresholds are installed.









the area around the heating vent is now solid. no squeaks at all in the new flooring so far. the thresholds to the kitchen (left) and bathroom (right) still have to be installed.

Sunday, March 22, 2009

sand job


2nd floor kitchen floor is now ready to be refinished... we left the house keys in the hands of the contractor, so it should be done by next weekend when we get up there. we've never handled a floor sander before, and considering the original floor is in such good condition (below the glued on paper you can see here), opted not to screw it up by doing it ourselves.







the hallway in the 2nd floor leading from the front door, past the living room to the kitchen also had what was probably the original flooring on it. however, when the heating vent was retroactively added, the floor and joists were cut to accommodate (see also 1st floor bathroom... it's a real trend in this house), and as well as the patching not looking great, it was pretty bouncy/squeaky. so, the best idea was to take out the old floor, fix the subfloor and lay a new one. this should also be completed by next weekend.




we're definitely trying to get a move on now with renovations so we can move back upstairs and get the 1st floor rented. stopped at ikea on the way back to the city tonight and bought a third of the kitchen; a couple more trips and we should have everything.